Making a complex live-hospital build easy to understand
Dorset County Hospital’s new Emergency Department and Critical Care Unit is being delivered on a constrained live hospital site, where maintaining clinical operations and emergency access throughout construction is critical.
ADS was appointed during pre-construction to create a detailed 3D phasing animation that clearly communicated how the scheme would be built, how the programme would progress and how key access routes would be maintained.
By combining the construction sequence with an animated programme timeline, we turned a complex build strategy into a visual story that could be quickly understood by both technical and non-technical stakeholders.
Objectives
- 01 Clearly communicate a complex construction programme and phasing strategy.
- 02 Demonstrate how blue-light access to the Emergency Department could remain operational throughout the works.
- 03 Provide the NHS Trust and clinical team with a clear visual tool to review the proposed construction sequence.
Turning the programme into a visual sequence
The programme involved multiple overlapping stages, from enabling works and groundworks through to structure, envelope, external works and final connections into the existing hospital.
We translated these stages into a clear animated sequence, with construction activity shown directly alongside the programme timeline.
This enabled the project team to understand not only when each activity would happen, but also where it would happen and how the site would change around it.
Keeping blue-light access operational
One of the key challenges was maintaining emergency vehicle access to the existing Emergency Department while major construction works took place alongside it.
The animation showed changing traffic routes, construction zones and site logistics throughout each phase, clearly demonstrating how blue-light access could remain operational during the build.
Supporting NHS and clinical review
The animation was presented to Dorset County Hospital NHS Foundation Trust and used with the clinical lead to review the proposed construction sequence and its operational implications.
Visualising the programme in 3D gave stakeholders a much clearer way to understand each phase and provide informed feedback before construction began.
From programme to practical communication tool
The final animation brought together programme, site logistics and construction methodology within one visual narrative.
It gave Tilbury Douglas a practical presentation tool for communicating the build strategy to the NHS Trust, clinical stakeholders and wider project team.

From pre-construction to delivery
The animation was created during the pre-construction stage, helping stakeholders understand the proposed build well before major works began on site.
The scheme has since progressed into full construction, demonstrating how early visual communication can support the delivery of complex healthcare projects.
The work has been invaluable to help clinicians understand how the project will work
Gareth Drake - Regional Construction Manager - Tilbury Douglas